Individual sections and volumes of work are measured. The rest is estimated based on these measurements
Business trips of employees
It’s expensive so it happens infrequently, on remote costruction sites
Reports of completion
Information on the types and volumes of work performed. Often can be inaccurate or submitted with delays
A simple solution to oversee all the processes of a construction project
Measurement of lengths, angles, areas and volumes to verify contractors' reports
Point cloud comparison mode to visually assess the actual changes at the construction site
Archive of point clouds to monitor change trends
Track the work actually performed at the construction site
Drone surveillance
Monitor whether and how much work was performed
Create a daily progress chart based on the construction schedule
End-to-end linking: objects tree, clouds, schedules and cost estimates
Create construction schedules and cost estimates from scratch or import them from PM and takeoff software, respectively
Oversee the work schedule and project budget
Schedules and cost estimates
Start working in the system with any data set
The system accumulates all the information regarding the project, giving you a full-scale digital asset
Project documentation
Actual information
Design documentation
2D/3D models
BIM
Drawings
Maps
Site plans
Construction schedule
Cost estimate
Start working in the system with any data set
The system accumulates all the information regarding the project, giving you a full-scale digital asset
Project documentation
Actual information
Point clouds
360° panoramic shots
Orthophotomaps
Video
Satellite images
3 steps to start a project in NovoBIM
Collect project data and import into the system
1
1st day
3D scene and objects tree preparation
2
2nd day
Link to cost estimates and schedules
3
3rd day
Full control over construction
4
Result
3 steps to start a project in NovoBIM
Collect project data and import into the system
1
1st day
3D scene and objects tree preparation
2
2nd day
Link to cost estimates and schedules
3
3rd day
Full control over construction
4
Result
3 steps to start a project in NovoBIM
Collect project data and import into the system
1
1st day
3D scene and objects tree preparation
2
2nd day
Link to cost estimates and schedules
3
3rd day
Full control over construction
4
Result
3 steps to start a project in NovoBIM
Collect project data and import into the system
1
1st day
3D scene and objects tree preparation
2
2nd day
Link to cost estimates and schedules
3
3rd day
Full control over construction
4
Result
Advantages of NovoBIM
Monitor supply and consumption of construction materials
Track material consumption trends and standard delivery and storage periods
30% less cost for the work of surveyors
NovoBIM allows you to measure the geometry of an object (area, angles, distances) remotely
Thanks to the tools for comparing the BIM model with point clouds, searching for inconsistencies takes as little as a few minutes
20% lower costs for correcting errors
Everything can be estimated in the system, including the quantity of builders and equipment, and the amount of work performed
Easy oversight of contractors
Business trips to the construction site are needed only at the most critical stages
2−3 times fewer team’s business trips
Save time with no field inspections or manual report preparation
6 times less time to update information
NovoBIM works even if you don't have a BIM model
OT purpose
NovoBIM lets you manage construction even with a small amount of project data. For this an objects tree (OT) is built in the system. This is a model of the site in the form of an element tree containing attributive information on all the construction elements — from nuts to fittings.
Structural elements of a building
Delineates details (elements of buildings or structures) in a common point cloud
Supplements the point cloud with attributive information regarding materials, sizes, and brands
Makes it possible to work with clouds as multicomponent information models
Serves as a link between clouds and other means of construction visualization, cost estimates, and construction schedules